Skip to Main Content
ADD A NEW IDEA

Entire System Management and Cronus

Showing 5

Copy SYSOUT Files not only to BS2000 Nodes, but to Linux Nodes also

In 'Job maintenance', for Unix and Windows jobs, it is possible to define a handover of SYSOUT files from the execution system to a BS2000 system. This is done by setting a 'SYSOUT node' (together with a 'SYSOUT Cat ID' and a 'SYSOUT User ID') in ...
Hermann Pfeiffer 12 months ago in Entire System Management and Cronus / Entire Operation (NOP) 0 Under development

NOP - end date of a network schedule definition

Add an "end date" for a network schedule, until a network/job will be execued, see attached screen shot. Currently there is ""effective from" only. An additional field "effectitve to" is requested. This means, a job (like build NATMF 9.2.1) will b...
Georg Schmitt 4 months ago in Entire System Management and Cronus / Entire Operation (NOP) / Entire Operations GUI client (OGC) 0 Under development

NPR-View: ZIIP-CPU-Time needed

We need the posibility to get not only the CPU-Time from GCP, but also from ZIIP-CPU-Time for example in ACTIVE-JOBS. For example an ADABAS-DB shows actually 140 seconds CPU-Time used in ACTIVE-Jobs. On zOS we see, that the DB used 6700 seconds CP...
Reiner Koester over 1 year ago in Entire System Management and Cronus / Entire System Server (NPR) 0 Under development

Linux version of Archiving Parameters instead of z/OS Parameters

With NOM under Linux the 'Archiving Parameters' screen (8.1.5) is filled with z/OS type fileds, i.e. fields only relevant under z/OS. This is inadequate and confusing. A screen version for Unix containing only fields relevant under Linux would be ...
Hermann Pfeiffer almost 2 years ago in Entire System Management and Cronus / Entire Output Management (NOM) 1 Under development

active help for keywords

Is it possible to implement an active help for the keywords in NOM? Getting a list of defined keywords in the system and perhaps also the number of report definitions which include this keyword. Of course only if performance is acceptable.
Christina Möllenberg about 1 year ago in Entire System Management and Cronus / Entire Output Management (NOM) 0 Under development