Skip to Main Content
The Adabas & Natural Ideas Portal does not contain ideas from products ApplinX and EntireX. Please refer to the IBM Ideas Portal for these products (IBMid required).
ADD A NEW IDEA

Clear

Ideas

Showing 16 of 374

Enhance Hyperdescriptor Exit for Natural Mainframe Server to cover other areas too

With Natural 9.1.2 we introduced a hyperdescriptor exit NATHX15 to improve the performance when reading Natural object names on a Mainframe server.This exit was enhanced with Natural 9.2.1 to also fast read Natural library names. It should be cons...
Stefan Diehl about 1 year ago in Natural for z/OS / Natural (NAT) / Natural Development Server (NDV) / Utilities 0 Planned

Displaying aktive symbols in active networks OGC

Displaying avtive symbols in active networks would be very helpful for monitoring and planing productive work.
Walter Schulte about 3 years ago in Entire System Management and Cronus / Entire Operations GUI client (OGC) 0 Not in Plan

NOP Defaults Avoid Inconsistent time frame

Seit NOP552 CF7 zOS werden die NOP-Defaults für spätesten Start und Endezeit eines Netzes/Jobs anscheinend genauer geprüft, d.h. bisher gleichdefinierte Zeiten führen beim Aktivieren/Reaktivieren von Netzen zur Meldung: Inkonsistenter Zeitrahmen, ...
Walter Schulte over 2 years ago in Entire System Management and Cronus / Entire Operation (NOP) 0 Planned

Extension of the shutdown command for the NOM monitor to set a time value

Using the modify command „F ESYxxx,SHUTDOWN=NOM” to shutdown the NOM monitor, the NOM monitor is working until there is "nothing" left to do. So it is not possible to get the NOM monitor down in a predictable time. The only possibility is to shutd...
Christina Möllenberg over 1 year ago in Entire System Management and Cronus / Entire Output Management (NOM) 0 Not in Plan

Tracing Report Processing under Linux

Despite the documentation states so, tracing of report processing seems to be not possible with NOM running under Unix. If you choose this option (command TRACE, for instance) you'll get a screen "Trace Report Processing JES" with z/OS related inp...
Hermann Pfeiffer over 3 years ago in Entire System Management and Cronus / Entire Output Management (NOM) 2 Not in Plan

NOP-Monitor-Status Kommandos (Anhalten, Freigeben) gegen die Tasks 51 und 91 ermöglichen

In NOP 5.5.2 (CF 3) ist es nicht möglich, beim NOP-Monitor-Status Kommandos (Anhalten, Freigeben) gegen die Tasks 51 und 91 abzusetzen. Aufgefallen ist das beim Versuch, eine Loop-Situation in der Task 51 aufzulösen. In NOP 5.4.3 ist die Eingabe d...
Walter Schulte over 3 years ago in Entire System Management and Cronus / Entire Operation (NOP) 0 Planned

Parameter SUBSID in NDV configuration

We had recently iTrac NATMF-28544: "NDV server ABEND U4087 during clean-up at SESSION_TIMEOUT". Analysis of the problem showed that a LX value for NATASM was 0, and further that the subsystem name was "$#@$", because customer had migrated from NAT...
Philippe Van Coppenolle about 2 years ago in Natural for z/OS / Natural Development Server (NDV) 0 Future consideration

OGC: erweiterter Netzplan, Übersicht über Netzabhängigkeiten in OGC

Bisher ist es nur möglich ein Netzplan für ein Netz anzuzeigen, welcher eine Übersicht über die Abhängigkeiten der zum Netz gehörenden Jobs gibt. Externe Bedingungen werden zwar angezeigt, ermöglichen aber nicht das "Gesamtbild" der netzübergreife...
Volker Kautz over 4 years ago in Entire System Management and Cronus / Entire Systems Management (ESM) 0 Not in Plan

NOP: Export Feature Schedule Definition

Comment of the requester Herr Schneider on 2023-07-25: From my point of view, there is no need for the change we want for the other customers, but there is also no contradiction. Therefore, from my point of view, the change could be analysed furth...
Georg Schmitt about 2 years ago in Entire System Management and Cronus / Entire Operation (NOP) / Entire Operations GUI client (OGC) 0 Future consideration

Printer status in NOM

Printer Control Functions : Start a printer Stop a printer - Stops immediately all the printer activities. Halt a printer - Stops the printer after it will finish the report currently printing. Move a report to another printer/user. Copy a report ...
Brouria Carni Hadass over 3 years ago in Entire System Management and Cronus / Entire Output Management (NOM) 0 Not in Plan