Skip to Main Content
The Adabas & Natural Ideas Portal does not contain ideas from products ApplinX and EntireX. Please refer to the IBM Ideas Portal for these products (IBMid required).
ADD A NEW IDEA

Clear

Ideas

Showing 23 of 373

Long-Alpha field support in Replicator

“ADABAS currently supports Long-Alpha fields. We are now using Replicator to replicate from our Adabas files into Sql Server tables. Unfortunately at this time, Replicator does not seem to support replicating the long alpha fields. We would like t...
David Wilbur over 3 years ago in Adabas for z/OS / Adabas (ADA-zOS) / Event Replicator Server (ARF) 0 New

Add deletes in ISN-specific initial state.

When performing an initial state based on a list of ISN's - typically the use case is to bring the target up-to-date for the listed records. Unfortunately, this synchronization will only work for inserts and updates - not for deletes. I suggest to...
Bjarne Sørensen about 1 year ago in Adabas for z/OS / Event Replicator Server (ARF) 0 Under Review

Displaying aktive symbols in active networks OGC

Displaying avtive symbols in active networks would be very helpful for monitoring and planing productive work.
Walter Schulte about 3 years ago in Entire System Management and Cronus / Entire Operations GUI client (OGC) 0 Not in Plan

Introduce a grace period for the DCOMMITTHRESHOLD.

Introduce a new feature and parameter DCOMMITWAIT which will have the REPTOR not commit messages with less than DCOMMITTHRESHOLD transactions until DCOMMITWAIT milliseconds have passed. While it will introduce a small delay - it will allow greater...
Bjarne Sørensen over 3 years ago in Adabas for z/OS / Event Replicator Server (ARF) 0 New

NOP Defaults Avoid Inconsistent time frame

Seit NOP552 CF7 zOS werden die NOP-Defaults für spätesten Start und Endezeit eines Netzes/Jobs anscheinend genauer geprüft, d.h. bisher gleichdefinierte Zeiten führen beim Aktivieren/Reaktivieren von Netzen zur Meldung: Inkonsistenter Zeitrahmen, ...
Walter Schulte over 2 years ago in Entire System Management and Cronus / Entire Operation (NOP) 0 Planned

Extension of the shutdown command for the NOM monitor to set a time value

Using the modify command „F ESYxxx,SHUTDOWN=NOM” to shutdown the NOM monitor, the NOM monitor is working until there is "nothing" left to do. So it is not possible to get the NOM monitor down in a predictable time. The only possibility is to shutd...
Christina Möllenberg over 1 year ago in Entire System Management and Cronus / Entire Output Management (NOM) 0 Not in Plan

Feature to shut down REPTOR waiting first for all source nuclei to disconnect

Issuing ADAEND to a REPTOR should not be done before the connected source nuclei have ended. When shutting down a production environment (typically before an IPL) - you can automate that the source nuclei (EG DB1,DB2,DB3) tasks have ended before A...
Bjarne Sørensen over 1 year ago in Adabas for z/OS / Event Replicator Server (ARF) 0 Under Review

Deactivate subscription on ADAF7F to avoid inconsistent target.

The message ADAF7F is issued when a response code comes from the decompression of a record. Such errors can be sporadic in the case of rsp 42/2 caused by a too small LFP. As a result - sporadically - changed records are not replicated. This causin...
Bjarne Sørensen over 1 year ago in Adabas for z/OS / Event Replicator Server (ARF) 0 Under Review

Tracing Report Processing under Linux

Despite the documentation states so, tracing of report processing seems to be not possible with NOM running under Unix. If you choose this option (command TRACE, for instance) you'll get a screen "Trace Report Processing JES" with z/OS related inp...
Hermann Pfeiffer over 3 years ago in Entire System Management and Cronus / Entire Output Management (NOM) 2 Not in Plan

NOP-Monitor-Status Kommandos (Anhalten, Freigeben) gegen die Tasks 51 und 91 ermöglichen

In NOP 5.5.2 (CF 3) ist es nicht möglich, beim NOP-Monitor-Status Kommandos (Anhalten, Freigeben) gegen die Tasks 51 und 91 abzusetzen. Aufgefallen ist das beim Versuch, eine Loop-Situation in der Task 51 aufzulösen. In NOP 5.4.3 ist die Eingabe d...
Walter Schulte over 3 years ago in Entire System Management and Cronus / Entire Operation (NOP) 0 Planned