Skip to Main Content
The Adabas & Natural Ideas Portal does not contain ideas from products ApplinX and EntireX. Please refer to the IBM Ideas Portal for these products (IBMid required).
ADD A NEW IDEA

Clear

Ideas

Showing 18 of 374

avoid "ADARSP074 - LWKP2 too small" for 24*7 databases

After Adasav restore of a very large file, and running an application to this file, the application received ADARSP074. This happened because LWKP2 was not set and Adabas calculates this part at startup(using the TOPISN of the largest file). The n...
Guest over 4 years ago in Adabas for z/OS / Adabas (ADA-zOS) / HA 0 Planned

EP#5820 modification of files

modification of files Requestor: D'ARVA SOCIETE Platform: MF SR-Number: 707497 Product Code: ADA Initial Importance: medium Proposal: To access (and update/store) ADABAS data on the mainframe from our Web server, we use EntireX servers (as STCs) w...
Guest over 4 years ago in Adabas for z/OS / Adabas (ADA-zOS) / HA 1 Planned

Allow Adabas Cluster Services maintenance without downtime.

z/OS can upgrade one LPAR at a time in the cluster - but Adabas needs all cluster nuclei to be down to upgrade between releases or to apply particular zaps. Make Adabas Cluster Services able to be upgraded without downtime. From duplicate ADAMF-I-...
Bjarne Sørensen about 3 years ago in Adabas for z/OS / Adabas (ADA-zOS) / Adabas Cluster Services (ALS) / HA 0 New

Displaying aktive symbols in active networks OGC

Displaying avtive symbols in active networks would be very helpful for monitoring and planing productive work.
Walter Schulte about 3 years ago in Entire System Management and Cronus / Entire Operations GUI client (OGC) 0 Not in Plan

NOP Defaults Avoid Inconsistent time frame

Seit NOP552 CF7 zOS werden die NOP-Defaults für spätesten Start und Endezeit eines Netzes/Jobs anscheinend genauer geprüft, d.h. bisher gleichdefinierte Zeiten führen beim Aktivieren/Reaktivieren von Netzen zur Meldung: Inkonsistenter Zeitrahmen, ...
Walter Schulte over 2 years ago in Entire System Management and Cronus / Entire Operation (NOP) 0 Planned

Extension of the shutdown command for the NOM monitor to set a time value

Using the modify command „F ESYxxx,SHUTDOWN=NOM” to shutdown the NOM monitor, the NOM monitor is working until there is "nothing" left to do. So it is not possible to get the NOM monitor down in a predictable time. The only possibility is to shutd...
Christina Möllenberg over 1 year ago in Entire System Management and Cronus / Entire Output Management (NOM) 0 Not in Plan

Make calculation of expanded file chain while nucleus is active

KB article 1765090 is related to this feature request.Sequence of events: ADASAV back up database; ADADBS delete all application files; ADAORD REORDB; ADASAV restore FMOVE all application files (expanded files in the database) back into database. ...
Guest over 4 years ago in Adabas for z/OS / Adabas (ADA-zOS) / HA 0 Under Review

ADADABS ALLOCATE/DEALLOCATE to be allowed even if file currently used

Currently, it is not possible to proceed with an ALLOCATE/DEALLOCATE of space on a file with ADADBS if a file is used ( even if is it only being read).We have got very big files (high number of records and high number of cylinders in allocation) i...
Guest over 4 years ago in Adabas for z/OS / Adabas (ADA-zOS) / HA 0 Under Review

Tracing Report Processing under Linux

Despite the documentation states so, tracing of report processing seems to be not possible with NOM running under Unix. If you choose this option (command TRACE, for instance) you'll get a screen "Trace Report Processing JES" with z/OS related inp...
Hermann Pfeiffer over 3 years ago in Entire System Management and Cronus / Entire Output Management (NOM) 2 Not in Plan

NOP-Monitor-Status Kommandos (Anhalten, Freigeben) gegen die Tasks 51 und 91 ermöglichen

In NOP 5.5.2 (CF 3) ist es nicht möglich, beim NOP-Monitor-Status Kommandos (Anhalten, Freigeben) gegen die Tasks 51 und 91 abzusetzen. Aufgefallen ist das beim Versuch, eine Loop-Situation in der Task 51 aufzulösen. In NOP 5.4.3 ist die Eingabe d...
Walter Schulte over 3 years ago in Entire System Management and Cronus / Entire Operation (NOP) 0 Planned